Owner's-side leadership from site selection through commissioning.

Delivery teams change from one phase to the next. We stay with the owner through every handoff and plan each phase around when power will be available.

Why it matters

What a thin owner's team costs.

Weak planning and unclear ownership consume capital long before a project is visibly in trouble. Our job is to keep the approved plan and the field in step, and to say so early when they drift.

PMI puts the capital lost to poor planning and execution at 9–11%. CII reports that 70% of capital projects miss cost or schedule targets by 10% or more.

Project Management Institute · Construction Industry Institute

~20%
Shorter schedules

Case studies of PMC-led programs report schedules about 20% shorter than programs without an owner's-side team.

~25%
Productivity and cost

Case studies of owner-backed, PMC-led planning report about 25% higher productivity and about 10% lower cost.

$75B+
Across our team's programs

Our team brings more than 85 combined years of experience in data center deployments totaling over $75 billion.

01Development and power

Site selection & due diligence

Site selection commits far more than the cost of land. Power availability, interconnection timing, permitting, water, and fiber all decide when a campus can operate. We lead the owner's diligence with power first and quantify the development risk on every shortlisted site.

Outcome

A site you can finance, with power timing and development risk quantified before you commit.

Power & site readiness
Utility power availability, queue position, and interconnection diligence
Transmission versus distribution access and upgrade risk
Behind-the-meter power feasibility: gas, fuel cells, BESS, microgrids
Land control, zoning, permitting, and entitlement strategy
Development risk
Environmental, geotechnical, flood, and resiliency risk
Market access, latency, and offtake adjacency
Incentives, tax abatements, and infrastructure credits
Total cost to energize and an auditable investment case
02Development through execution

Design & engineering oversight

The design has to match the power that will be available and the capacity the owner has actually sold. We govern the owner's requirements and basis of design, then test every major decision against cost, schedule, and lifecycle.

Outcome

A design sized to the power you will have and the capacity you have sold.

Requirements & architecture
Owner's Project Requirements (OPR) and Basis of Design (BOD) governance
MW, rack density, and AI/HPC scalability planning
Power architecture validation: utility, behind-the-meter, redundancy philosophy
Cooling strategy: air, liquid, or hybrid
Design & delivery planning
Modularization, prefabrication, and constructability reviews
Cost, schedule, and lifecycle trade-offs
Integrated schedule development and execution planning
Design deliverable reviews against the owner's acceptance criteria
03Long-lead equipment

Procurement, fabrication & contracts oversight

Long-lead power equipment now sets the schedule for most campuses. We shape the procurement strategy early, qualify the vendors, and track fabrication and logistics against the required-on-job dates in the owner's schedule.

Outcome

Long-lead power equipment ordered in time, with alternate sources identified for the riskiest packages.

Procurement & vendor oversight
Long-lead power equipment strategy: transformers, switchgear, generators, BESS
Utility, self-perform, or OEM-direct procurement decisions
Owner-furnished scope and contract strategy
Vendor qualification, factory inspections, and FAT oversight
Supply chain assurance
Fabrication schedule assurance, logistics, and expediting
Modularization and integration strategies
Power equipment risk mitigation and alternate sourcing
Expediting reports tied to the owner's schedule
04Execution and power integration

Construction oversight

The owner's leverage changes once construction starts. We govern the EPC or GC against the baseline, manage the interfaces between power, building, and IT, and review every change for cause, price, and entitlement.

Outcome

Fewer construction and power-driven delays, and every change priced before it is approved.

Field & power integration
EPC/GC field governance and performance management
Power infrastructure integration: substations, yards, behind-the-meter assets
Safety, quality, and productivity oversight
Sustainability and CO₂ reduction in execution
Delivery controls
Interface management across utility, power plant, buildings, and MEP
Change control, claims avoidance, and recovery planning
Critical-path and power-driven schedule control
White space and server fit-out support
05Energization and handover

Commissioning & start-up oversight

A data center cannot enter service until its systems perform together. We plan backward from the ready-for-service date, sequence testing around actual dependencies, and close issues only when the evidence meets the owner's criteria.

Outcome

Ready-for-service (RFS) on the committed date, backed by IST results and complete turnover records.

Commissioning & energization
Integrated Level 1–5 commissioning governance
Integrated QA testing
Utility energization and power-up coordination
Behind-the-meter power, microgrid, and islanding validation
Readiness & reliability
Reliability, performance, and failover testing, including IST
Turnover documentation and asset readiness
Day-1 operations readiness and handover
Capacity ramp support
Across every phase

One team across every phase.

One owner's-side team from development through operations. We build cost and schedule baselines a lender can review, and we can tie our fees to the targets you are measured on.

Lifecycle support
Project & construction management
Integration management
Risk and compliance advisory
Sustainability consulting & carbon asset monetization
Behind-the-meter power solutions

Cost management

  • Independent cost estimating and validation
  • Lender-approved cost baselines
  • Structured contingency governance
  • Forecast-to-complete reporting
  • Change order challenge and validation
Incentive alignment

Incentives tied to achieving or beating cost targets while holding scope and quality.

Schedule management

  • Integrated master schedule
  • Critical-path monitoring with a lean production system
  • Interface management between power, building, and IT
  • Long-lead procurement integration
  • Schedule risk analysis
Incentive alignment

Incentives tied to hitting milestones and raising schedule problems early.

Who we serve

Who we work for.

01

Data center developers and platform sponsors

Owner's-side governance from site diligence through operations, with the same controls and reporting on every site you add.

02

Hyperscale, AI, and enterprise offtakers

Independent assurance that committed capacity arrives on the date and at the cost the business planned around.

03

Lenders, infrastructure funds, and capital partners

Validated cost baselines, structured contingency governance, and forecast-to-complete reporting you can underwrite.

04

OEMs and supply chain partners entering the market

What hyperscale buyers expect in qualification, factory testing, and delivery dates, from people who have run those programs.

How we engage

Three ways to engage us.

01

Full program leadership

CorePhase establishes and runs the owner's program office, including governance, controls, execution leadership, and commissioning.

02

Owner's team augmentation

Senior program directors, schedulers, cost managers, and commissioning leads embedded in your organization and working under your badge.

03

Controls and assurance

We establish independent baselines, reporting, risk management, and procurement tracking for programs led by other delivery teams.